RP Local Delivery Date is moving older store configurations to an updated
scheduling calculation. Support may refer to the older calculation as
scheduling v1 and the updated calculation as scheduling v2.
This is an internal app calculation version. It is not the Shopify API version,
your app subscription, or a setting that you need to change yourself.
Why the calculation is changing
Delivery and pickup profiles can have a different preparation time for each
weekday. The older calculation could use the preparation rule for the weekday
on which a customer placed the order when calculating later availability.
That could make a future pickup or delivery date behave differently depending
on the current day of the week. For example, a Saturday configured with its own
preparation time might not always be evaluated using Saturday's rule.
Scheduling v2 evaluates each requested delivery or pickup date using the rule
configured for that date's weekday. This makes weekday-specific preparation
times more predictable.
Calculation | How weekday preparation time is evaluated |
Scheduling v1 | The current order-placement weekday can drive the preparation window for later dates. |
Scheduling v2 | Each candidate delivery or pickup date uses its own weekday's preparation rule. |
What may change after migration
Most stores with the same preparation time every day should see little or no
difference. A store is more likely to notice a change when it uses:
different preparation times on different weekdays;
time slots or exact pickup or delivery times;
cutoff times;
blackout dates near the beginning or end of a preparation window; or
a schedule that crosses a weekend or closed day.
After migration, the first available date or time may move earlier or later so
that it matches the rule configured for the target weekday. Existing weekday,
blackout-date, future-date, and capacity settings are not intentionally removed
by the migration.
How migration works
RP Local Delivery Date support and engineering manage this migration. You do
not need to reinstall the app or recreate your locations.
The migration process is:
Review the current delivery and pickup profiles.
Confirm the intended preparation time for each weekday.
Test representative dates and time slots using scheduling v2.
Move the store to scheduling v2.
Verify the storefront calendar and checkout behavior.
Restore the previous calculation while the configuration is reviewed if a
material difference is found.
Do not reduce preparation times or open dates that you cannot fulfill only to
make another date selectable. Record the unexpected result and contact support
first.
What to test
After support confirms that your store has migrated, test:
the first available delivery and pickup date;
a busy weekday with a different preparation time;
the first and last time slot on that date;
dates immediately before and after a blackout period;
dates before and after a cutoff time; and
the furthest date allowed by your future-date setting.
Use a private browser window so an older storefront page does not affect the
test.
Information support may request
Send support:
your
.myshopify.comdomain;the affected delivery or pickup location;
the preparation time configured for each relevant weekday;
the store timezone;
the date and local time when the customer tried to order;
the date or time slot that should have been available; and
screenshots of preparation time, cutoff, blackout-date, and future-date
settings.
Do not send passwords, payment information, access tokens, or sensitive
customer information.